SED Turbine

PROJECT:  Seneca Nation of Indians – Community Scale Wind Energy Development

Project Details:

Owner – Seneca Nation of Indians / Sustainable Energy Developments (SED)

Contract Value – $645,000

Year – 2016

Scope – As a team member of the Seneca Nation of Indians and Sustainable Energy Developments, Kandey was subcontracted to perform the following tasks required for the installation of a new Vensys 1.5 MW wind turbine

  • Site clearing, grading, access roads and staging areas for new wind turbine installation
  • Cast in place concrete wind turbine foundation placed at existing grade over Controlled Modulus Columns (CMC)
  • Placement of embankment materials over new turbine foundation to act as ballast
  • Excavation, backfill and concrete encasement of new electric duct bank
  • Cast in place switchgear pad
  • Restoration of disturbed lawn areas
Rush Creek
May 18, 2017
BNIA Fuel Farm Pipe Supports
May 18, 2017
Rush Creek
May 18, 2017
BNIA Fuel Farm Pipe Supports
May 18, 2017