PROJECT: ECWA 48” & 42” Transmission Main Condition Assessment & Transient Analysis

Project Details:

Owner – Erie County Water Authority

Contract Value – $656,000

Year – 2022-2023

Scope includes construction of insertion & extraction points for a planned future condition assessment of owners 48” & 42” PCCP Transmission mains including the following.
1. Install two 16” steel welded taps and blind flanges on existing 48” steel pump discharge piping
2. Install two separate CIP concrete structures around existing 42” PCCP including 16” & 6” taps on existing pipe
3. Excavate at (10) existing 48” & 42” PCCP pipe locations to install an 8” pipe over existing PCCP to be utilized for assessment tracking