PROJECT: Wastewater System Improvements, Plant 5 Flow Metering
Project Details:
Owner – Town of West Seneca NY
Contract Value – $2.7 Million
Year – 2022-2023
Scope –
1. Set up a bypass pumping system capable of handling entire facility flows
2. Installation of new CIP flowmeter structure including 48” flow metering equipment
3. Installation of a new 48-inch FRP pipe with associated manholes and structures.
4. Modifications to an existing buried divergence structure.
5. Installation of a new 36-inch pipe with associated manholes
6. Sewer and manhole rehabilitation
7. Lawn & asphalt restoration