February 16, 2023PROJECT: City of Buffalo Michigan Ave. Watermain Rehabilitation Project.
Project Details:
General Construction
Cost – 4.6M
Completed – 7/2022
Project consisted of sliplining 3000 lf of existing 36” PCCP watermain with 30” Fusable PVC Pipe along with numerous interconnections. The project entailed working in the main corridor through the Medical Campus in downtown Buffalo.