Riverbend

Southtowns AWWTP
May 18, 2017
Rush Creek
May 18, 2017

PROJECT:  Buffalo High Tech Manufacturing Hub @ Riverbend (Solar City)

Project Details:

Owner – Fort Schuyler Corp / Anastasi Trucking

Contract Value – $3.6 Million

Year – 2015 – 2016

Scope – As a team member of Anastasi Trucking & Paving Company, a reputable local site contractor, Kandey was subcontracted for the onsite and offsite utilities including

  • Approximately 7000 LF of 6” through 16” underground ductile iron fire and domestic water systems including valve, hydrants and appurtenances
  • Approximately 4800 LF 4” through 12” underground gravity sanitary sewer including 25 manholes
  • 3 sanitary sewer pump stations and valve vaults complete with pumps, pipe valves and fittings including tight sheeting to depths of 26’ below grade
  • 2600 LF 18” underground butt fused HDPE sanitary sewer force main and fittings
  • Two 12” water taps to existing 16” main, extended into meter building including backflow preventers on domestic system with associated pipe, valves and fittings
  • 27” offsite gravity sewer within roadway including manholes and cast in place concrete structure over existing sewer main